BRIDGES · BARRANQUILLA
Pumarejo Bridge
Detailed studies and final design for the Magdalena River crossing.
- Client
- INVÍAS
- Period
- 2013–2015
- Scope
- 380 m main span · 2.88 km between abutments · 6 lanes
CASE STUDY
Engineering applied to an infrastructure challenge.
Jorge Fandiño S.A.S. participated, together with other firms, in the Phase III design of the cable-stayed bridge, its approach viaducts and road connections.
Technical scope
- Phase III design of the cable-stayed bridge
- Design of the approach viaducts
- Design of the road connections
- Detailed studies and final design for the Magdalena River crossing