Detailed studies and final design for the Magdalena River crossing.

Client
INVÍAS
Period
2013–2015
Scope
380 m main span · 2.88 km between abutments · 6 lanes

CASE STUDY

Engineering applied to an infrastructure challenge.

Jorge Fandiño S.A.S. participated, together with other firms, in the Phase III design of the cable-stayed bridge, its approach viaducts and road connections.

Technical scope

  • Phase III design of the cable-stayed bridge
  • Design of the approach viaducts
  • Design of the road connections
  • Detailed studies and final design for the Magdalena River crossing