ESEN
Pumarejo Bridge over the Magdalena River at sunset

ENGINEERING · CONSULTANCY · INFRASTRUCTURE

Connecting regions.
Designing possibilities.

Consultancy, studies, design and independent supervision for infrastructure projects.

PUMAREJO BRIDGE
ACTING INFRAESTRUCTURAGet to know us BOGOTÁ, COLOMBIA

An integrated approach
to infrastructure.

We are Actividades de Ingeniería en Infraestructura S.A.S., known as Acting Infraestructura S.A.S.

We are a Colombian firm providing engineering studies and design, independent project supervision and technical advisory services. We integrate engineering disciplines with each project's environmental, social and land requirements.

OUR ORIGINS AND EXPERIENCE

ACTING builds on the track record of Jorge Fandiño S.A.S. and the professional experience of founding partner Jorge Fandiño Ramírez.

View and download portfolio

2026 company portfolio · PDF in English

Team in the office, corporate archive
The people behind every solution.Our team · Corporate archive

ABOUT US

Engineering with purpose.
Commitment at every stage.

Technical rigour, care for our surroundings and collaboration shape the way we approach every project.

01 / PURPOSE

Mission

We develop and manage engineering and architecture projects that help improve quality of life. We support our clients from feasibility and structuring through studies, design, independent supervision and oversight, with care for communities and the people who make each project possible.

02 / FUTURE

Vision

We aim to become a leading Latin American firm for consultancy and high-value infrastructure design. We seek sustainable growth, stronger partnerships and development opportunities for our team while creating value for clients and partners.

03 / COMMITMENT

Quality policy

We seek engineering and architecture solutions tailored to each project. We identify and manage risks, check source information and legal, environmental and social requirements, and continually improve our processes to balance quality, schedules and costs.

We work with integrity, protect the safety and wellbeing of our teams, seek to reduce environmental impacts and respect the rights of communities.

OUR TRACK RECORD

Experience in numbers.

Figures from the track record of Jorge Fandiño S.A.S., the origin of ACTING Infraestructura.

Kilometres of roads

MORE THAN2,000

Rural and urban roads designed

Bridges designed

MORE THAN300

Across all bridge types

Architecture and urban design

MORE THAN500,000m²

Area designed

Projects delivered

MORE THAN100

Engineering and
infrastructure services.

We support project planning, design and delivery through consultancy and independent supervision services.

01

Consultancy and project structuring

We assess feasibility and support decisions throughout each project.

View services
  • Tender advisory services and project structuring.
  • Due diligence.
  • Risk and sustainability analysis.
  • Periodic reporting to oversight bodies and clients.
  • Technical advice during construction.
02

Studies and design

We develop solutions from pre-feasibility through detailed design.

View services
  • Technical and financial pre-feasibility (Phase I) and feasibility (Phase II) studies and design.
  • Detailed engineering studies and final designs (Phase III).
  • Environmental, social and land studies.
  • Planning and design of urban and rural road projects.
  • Railway studies and design.
  • Studies and design of complex structures.
  • Tunnel studies and design.
  • Airport studies and design.
  • Building studies and design.
  • Urban planning and landscape studies.
  • Design of waterfront promenades and similar structures.
03

Construction supervision

Comprehensive oversight of delivery, quality, resources and project obligations.

View services
  • Technical, administrative, financial, legal and environmental supervision.
  • Schedule monitoring and execution control.
  • Verification of regulatory and contractual compliance.
  • Quality supervision of materials and construction processes.
  • Assessment of environmental and occupational health and safety compliance.
  • Support for project land management and social management.
  • Project budget and financial control.
Enquire about a service
Railway corridor from the corporate archive

03 / SECTORS

Different challenges.
A multidisciplinary perspective.

  • Roads and highway concessions
  • Bridges and viaducts
  • Urban mobility and public spaces
  • Airports
  • Rail infrastructure
  • Other civil engineering works

Engineering with lasting impact.

A selection of projects from the track record of Jorge Fandiño S.A.S. and the professional experience of Jorge Fandiño Ramírez, which underpin ACTING Infraestructura.

EXPERIENCE SOURCE

Each profile identifies who contributes the experience and retains the available contractual or documentary support.

  • ACTING InfraestructuraDirect contract
  • Jorge Fandiño S.A.S.Corporate track record
  • Founding partnerProfessional experience

BRIDGES · BARRANQUILLA

Barlovento Bridge

Phase III structural, geometric and urban design studies.

Explore the project

Phase III studies and design for the bridge over the Las Compañías channel and its road connection between the existing and proposed roundabouts. The scope included detailed design of beams, foundations, pier caps, piers, bracing, road geometry and urban design.

Technical profile

Client
A Construir S.A.
Period
April 18 – July 18, 2017
Duration
3 months
Type
Prestressed beams / deck
Dimensions
120 m long · 22 m deck width
JORGE FANDIÑO S.A.S.Certified experience
BRIDGES · MONTERÍA

Third Bridge over the Sinú River

Phase III studies and designs for the bridge and its approaches.

Explore the project

Phase III studies and designs for the third bridge over the Sinú River and its approaches, plus a pre-feasibility solution for the Calle 20 road intersection. The structure was designed using balanced cantilever construction and post-tensioned girders.

Technical profile

Client
National Roads Institute — INVÍAS
Contract
1550 of 2021
Period
October 4, 2021 – August 3, 2022
Dimensions
381.50 m long · 160 m main span · 14.20 m wide
Contractor
Puente Sinú FIA Consortium
Participation
Jorge Fandiño S.A.S. · 40%
JORGE FANDIÑO S.A.S.Certified experience
Vehicular bridges on Avenida José Celestino Mutis at the Avenida Boyacá intersection
BRIDGES · BOGOTÁ

Avenida José Celestino Mutis Bridges

Design and construction of two vehicular bridges and one bicycle bridge at the Avenida Boyacá intersection.

Explore the project

Completion, update and refinement of designs, and construction of Avenida José Celestino Mutis —Calle 63— between Avenida Constitución and Avenida Boyacá, including the grade-separated intersection with Avenida Boyacá.

Technical profile

Client
Urban Development Institute — IDU
Contract
IDU 1851 of 2015
Infrastructure
2 three-lane vehicular bridges · 1 bicycle bridge
Lengths
393.30 m north carriageway · 392.55 m south carriageway · 357 m bicycle bridge
Contractor
Puente Mutis Joint Venture
JORGE FANDIÑO S.A.S.Certified experience
PEDESTRIAN BRIDGES · BOGOTÁ

Calle 127 pedestrian bridge

Design updates and construction of the bridge at Carrera 51.

Explore the project

Design updates, revisions and completion, and construction of the pedestrian bridge at Avenida Rodrigo Lara Bonilla (Calle 127) and Carrera 51 in Bogotá.

Technical profile

Client
Urban Development Institute — IDU
Contract
IDU-1341-2017
Period
October 30, 2017 – July 19, 2022
Contractor
Unión Temporal Cardozo & Fandiño
Participation
Jorge Fandiño S.A.S. · 20.07%
JORGE FANDIÑO S.A.S.Certified experience · Project visualizations
RAIL INFRASTRUCTURE

Bogotá–Belencito railway corridor

Phase III studies and design for 72 critical locations.

Explore the project

Definitive studies and design for construction works at 72 critical locations along the Bogotá–Belencito, La Caro–Zipaquirá and Bogotá–Facatativá corridors. The scope included surveying, geology, hydrology, hydraulics, geotechnical engineering, structures, drawings, quantities and cost estimates.

Technical profile

Client
Consorcio Dracol Vías Férreas
Period
2013–2014
Duration
12 months
Scope
72 critical locations · Phase III
CASE STUDYView full project
JORGE FANDIÑO S.A.S.Certified experience
RAIL INFRASTRUCTURE

Tren de Occidente · Pacific Railway Network

Technical direction of studies, design and rehabilitation across approximately 500 km of the Pacific Railway Network.

Explore the project

Technical direction of studies and design, including urban development and public spaces in towns along the corridor, and of rehabilitation, reconstruction and construction work on the Pacific Railway Network. This experience covers the Cartago–La Felisa, Buenaventura–Cartago and Zarzal–La Tebaida corridors.

Technical profile

Client
Tren de Occidente S.A.
Period
2006–2009
Duration
30 months
Scope
Approximately 500 km
Participation
Technical Director · Jorge Fandiño Ramírez
FOUNDING PARTNERCertified experience · Professional experience · Jorge Fandiño Ramírez
ROADS

Neiva–Espinal–Girardot

Phase III design across five functional units.

Explore the project

Design of a 197 km corridor. The reported scope includes 36 road bridges, six pedestrian bridges, eight intersections and public spaces.

Technical profile

Client
Neiva–Girardot Highway
Period
2016–2019
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
Buga–Buenaventura road corridor
ROADS

Buga–Buenaventura

Engineering studies and design between Loboguerrero and Buga.

Explore the project

Phase III design of functional units 4 and 5: 54.6 km of dual carriageway, covering alignment, geotechnics, pavements, hydrology, drainage, utilities and road safety.

Technical profile

Client
Consorcio Constructor Vía Pacífico
Period
2016–2019
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
URBAN MOBILITY · BOGOTÁ

El Rincón and Boyacá Avenues

Phase III road design and urban integration.

Explore the project

Design of 1.50 km of dual carriageway, a grade-separated interchange, three bridges and three small-span bridges.

Technical profile

Client
IDU
Period
2017–2019
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
AIRPORTS · BOGOTÁ

El Dorado International Airport

Detailed engineering for airport infrastructure.

Explore the project

Phase III design for the extension of runway 13L/31R and rapid-exit taxiways. Geometry, geotechnics, pavements, structures and electrical systems.

Technical profile

Client
Aerocivil
Period
2021
CASE STUDYView full project
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
Representative image of an airport control tower; it is not the tower designed for INVÍAS
Representative image · Harrison Keely / Wikimedia Commons · CC BY 4.0
AIRPORTS · BARRANQUILLA

Control tower designed to airport standards

Architectural, structural and technical design of a control tower for INVÍAS.

Explore the project

As a member of Consorcio Ecopuentes, Jorge Fandiño S.A.S. participated in the Phase III studies and designs for the Magdalena River crossing in Barranquilla. The scope included a control tower equivalent to those required at airports, intended for visual control and monitoring of instrumentation, lighting, and road and river traffic.

Technical profile

Client
National Roads Institute — INVÍAS
Contract
2200 of 2011 · Consorcio Ecopuentes
Period
March 26, 2012 – May 31, 2014
Dimensions
100 m total height · 312.4 m² control cab
Design
190 km/h design wind · foundation with six 1.50 m × 25 m piles
JORGE FANDIÑO S.A.S.Certified experience · INVÍAS · Contract 2200 of 2011
ROADS

Popayán–Santander de Quilichao

Phase III studies and design across four functional units.

Explore the project

Design of 76.35 km including road and pedestrian bridges, interchanges, U-turn facilities, urban works and service areas.

Technical profile

Client
Consorcio EPC Nuevo Cauca
Period
2015–2016
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
ROADS

Rumichaca–Pasto

Dual carriageway design between Rumichaca and El Pedregal.

Explore the project

Phase III design of 44 km across functional units 1, 2 and 3. Geometry, geotechnics, drainage, pavements, structures, signage and associated works.

Technical profile

Client
Consorcio SH (Sacyr–Herdoiza)
Period
2016–2017
CASE STUDYView full project
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
MOBILITY AND PUBLIC SPACES · BOGOTÁ

Calle 26 multimodal integration

Design of the pedestrian and cycling corridor between Avenida Caracas and Carrera 10.

Explore the project

Phase III design of the platform over Calle 26, connections and green areas to integrate the transport modes planned for the area.

Technical profile

Client
IDU
Period
2022–2023
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
Américas transit corridor extension — corporate archive
MASS TRANSIT · BOGOTÁ

Américas transit corridor extension

Updating, refining and supplementing Phase III designs.

Explore the project

Corridor between Puente Aranda and NQS, with an operational connection to Calle 26. The portfolio reports 2.50 km of corridor and connecting bridges. Image: project visualisation.

Technical profile

Client
IDU
Period
2016–2019
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
MASS TRANSIT · BOGOTÁ

Caracas transit corridor expansion

Feasibility and Phase III design for the extension between Molinos, Portal Usme, Yomasa and the new depot.

Explore the project

IDU-1109-2016 contract: feasibility studies and Phase III design for 7.5 km of roadway, 6.2 km of cycleway, four standard stations, one intermediate station, one terminal station, three road bridges, seven pedestrian bridges and 232,610 m² of public space.

The scope included the integrated design of a 45,000 m² depot and terminal with administrative, maintenance, washing, service and staff-welfare buildings; operating and parking areas; tanks, utilities, perimeter enclosures and a grade-separated access.

Technical profile

Client
IDU
Contract
IDU-1109-2016
Period
2017–2019
Participation
50% · Consorcio Troncal Caracas
Status
Closed out
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
URBAN DESIGN AND PUBLIC SPACE · LETICIA

Leticia Waterfront

Phase III studies and designs for the urban waterfront along the Amazon River, delivered by ACTING Infraestructura.

Explore the project

As a member of Consorcio Consultor Leticia, ACTING Infraestructura delivered the Phase III designs for approximately 800 m of urban waterfront, including a linear park, public space, cycleway, paths, amphitheatre, viewpoints, pedestrian walkways, roads and protection works. The project integrates four landscape units and hydraulic, landscape and structural solutions.

Technical profile

Client
INVÍAS · Contract 4230-2024
Period
2024–2025
Delivered by
ACTING Infraestructura S.A.S. · Consorcio Consultor Leticia
CASE STUDYView full project
ACTING INFRAESTRUCTURACertified experience · Contract delivered by ACTING · Final acceptance 10/12/2025
MOBILITY AND PUBLIC SPACE · MONTENEGRO

Paso Nacional through Montenegro

Phase III design of road infrastructure and a linear park.

Explore the project

Phase III design of a depressed roadway, a 230 m cut-and-cover tunnel, a 30 m bridge and a linear park.

Technical profile

Client
Consorcio ALC Montenegro 067
Period
2016–2017
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
URBAN MOBILITY · CALI

Vías de Cali Concession

Phase III road infrastructure and public-space design.

Explore the project

Phase III design for 11.4 km distributed across eight sections, including a grade-separated interchange, bridges, utility networks and public space.

Technical profile

Client
Vías de Cali Concession
Period
2010–2011
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
ROAD INFRASTRUCTURE · VALLE DEL CAUCA

Vías del Valle Concession

Phase III design of road corridors, bridges and urban infrastructure.

Explore the project

Phase III design for 40 km distributed across eleven sections, including seven road bridges, utility networks and urban infrastructure.

Technical profile

Client
Vías del Valle Concession
Period
2010–2011
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record
URBAN MOBILITY · BOGOTÁ

Avenida La Sirena (153rd Street)

Engineering studies and design for the northern carriageway between Autopista Norte and Avenida Boyacá.

Explore the project

Consultancy for the studies and design of the northern carriageway of Avenida La Sirena (153rd Street) in Bogotá. The scope covered roadway, traffic, utilities, public space, landscaping, and environmental and social components.

Technical profile

Client
Urban Development Institute — IDU
Contract
IDU-1601-2020 · Consorcio Vial del Norte
Period
2021–2022
Participation
Jorge Fandiño S.A.S. · 50 %
JORGE FANDIÑO S.A.S.Certified experience · Completion record No. 19
Representative image of topographic studies and designs for urban road solutions
AI-generated representative image · Not part of the contract's photographic record
URBAN ROAD SOLUTIONS · SINCELEJO

Sincelejo urban road solutions

Comprehensive studies and designs for 73 sections of the urban road network.

Explore the project

Multidisciplinary consultancy to develop road solutions for 73 urban sections in Sincelejo. The scope integrated topography, traffic and road signage, traffic management, pavements, geology and soils, hydrology and hydraulics, critical points, urban design, environmental studies, property management and construction budgets.

Technical profile

Client
Municipality of Sincelejo · Infrastructure Secretariat
Contract
CM-008-2022 · Consorcio Consultores CAA
Contract period
September 29, 2023 – September 20, 2024
Scope
73 urban sections · multidisciplinary studies and designs
Executed value
COP 1,532,072,640 · including VAT
Final acceptance
August 20, 2026 · Accepted as satisfactory
Representation
Jorge Fandiño Ramírez · Consortium legal representative
ACTING INFRAESTRUCTURACertified experience · Final acceptance August 20, 2026
Representative image of an urban and rural mobility study with traffic counts along a road corridor
AI-generated representative image · Not part of the contract's photographic record
MOBILITY PLANNING · YOPAL

Yopal Integrated Urban and Rural Mobility Plan

Comprehensive PIMUR update to guide mobility, traffic and transport across the municipality.

Explore the project

Consultancy to update the diagnosis and formulation of Yopal's Integrated Urban and Rural Mobility Plan. The project covers data collection, origin-destination matrices, transport analysis zoning, the road plan, parking, public and freight transport, road safety, mapping, participation and outreach.

Technical profile

Client
Municipality of Yopal · Mobility Secretariat
Contract
1001.84.2300-2023 · Consorcio Movilidad Yopal
Period
2024–2026
Initial value
COP 1,418,986,916.20
Components
Urban and rural mobility · public and freight transport · road safety
ACTING INFRAESTRUCTURACertified experience · Direct contract · Interim supervision report
Representative image of a social management and territorial analysis workshop supported by digital mapping
AI-generated representative image · Not part of the contract's photographic record
SUSTAINABILITY AND SOCIAL MANAGEMENT · COLOMBIA

INVÍAS Social Observatory

Conceptual, methodological, geographic and technological design for the social and territorial analysis of transport projects.

Explore the project

Consultancy to structure the INVÍAS Social Observatory with a territorial and social inclusion approach. The scope included source review, SATGEF methodology and indicators, validation across four pilot projects, a geographic information model, an Enterprise Geodatabase and interactive ArcGIS tools.

Technical profile

Client
National Roads Institute — INVÍAS
Contract
3147 of 2024 · Consorcio ACTING CIMA
Period
August 29, 2024 – October 31, 2025
Scope
62 variables · 93 indicator profiles · 4 pilot projects
Executed value
COP 1,997,610,056 · including VAT
ACTING INFRAESTRUCTURACertified experience · Contract delivered by Consorcio ACTING CIMA · Final acceptance November 12, 2025
SUPERVISION · ANTIOQUIA

La Unión–La Frontera–Sonsón Road

Supervision of improvement and maintenance works on Route 5601, Module 2.

Explore the project

Supervision of improvement and maintenance works on the La Unión–La Frontera–Sonsón road in the department of Antioquia. The contract covered monitoring of the works under Module 2 of Route 5601.

Technical profile

Client
National Roads Institute — INVÍAS
Contract
835 of 2012
Period
August 2, 2012 – August 15, 2013
Supervision consortium
Econsultores Consortium
Participation
Jorge Fandiño S.A.S. · 20%
JORGE FANDIÑO S.A.S.Certified experience
Visualization of the Calle 80 road interchange at 119th and 120th streets in Bogotá
INDEPENDENT SUPERVISION · BOGOTÁ

Calle 80 road interchange

Independent comprehensive supervision of the road interchange feasibility study.

Explore the project

Comprehensive supervision of the feasibility study for the road interchange at Avenida Medellín (Calle 80), Avenida Las Quintas (Carrera 119) and Carrera 120 in Bogotá.

Technical profile

Client
Urban Development Institute — IDU
Contract
IDU-1730-2022
Period
February 13 – October 12, 2023
Supervision consortium
Consorcio Intercambiador CAA
Participation
ACTING Infraestructura S.A.S. · 50%
ACTING INFRAESTRUCTURACertified experience · Direct contract · Termination certificate No. 10
Representative image of a road in Colombia's mountainous landscape; it is not part of the project's contractual record
Representative image · Saraym831 / Wikimedia Commons · CC BY-SA 4.0
INDEPENDENT SUPERVISION · CAUCA

Los Andes–Boquerón–La Playa road

Comprehensive independent supervision of improvements to two road sections between Corinto and Toribío.

Explore the project

Technical, legal, administrative, accounting and financial supervision of improvements to sections PR9+100–PR12+300 and PR18+700–PR21+900, delivered through Colombia's Works for Taxes mechanism in the department of Cauca.

Technical profile

Client
Alianza Fiduciaria S.A. · Works for Taxes
Contract
01 of 2021 · Consorcio DICO–FANDIÑO
Period
February 1, 2022 – October 19, 2023
Scope
Two 3.2 km sections · 6.4 km total
Participation
Jorge Fandiño S.A.S. · 40%
Executed value
COP 631,342,683 · including VAT
JORGE FANDIÑO S.A.S.Certified experience · Closed-out contract · 40% participation

More road and urban projects

References from the track record of Jorge Fandiño S.A.S.

Armenia–Montenegro–Quimbaya

Connectivity studies across four sections. Traffic, alignment, geotechnics, structures, utilities and surrounding conditions.

Technical profile

Client
INVÍAS
Period
2020–2022
Santa Ana–Mocoa–Neiva

Phase III design: geometric design over 456.2 km, LiDAR surveying, traffic, urban planning and architecture.

Technical profile

Client
Concesión Aliadas
Period
2016–2019

Explore the complete portfolio or use the filters to view a sector.

FEASIBILITY STUDIES

Road feasibility.
Integrated vision.

Experience in feasibility studies and design for strategic road corridors, with multidisciplinary analysis integrating alignment, structures, tunnels, geotechnics, hydraulics, pavements, environmental, social and land management.

Aerial view of the Neiva–Girardot dual carriageway
Neiva–Girardot Highway · Certified experience
01

BOYACÁ · SANTANDER

Transversal del Carare

Feasibility study for the Tunja–Puerto Araujo corridor, including upgrades, rehabilitation, new road, urban bypasses and 19 bridges.

Technical profile

Length
194 km
Client
CASS Constructores
Period
May–November 2014
JORGE FANDIÑO S.A.S.Certified experience
02

HUILA · TOLIMA

Neiva–Girardot Highway

Feasibility study for five functional units, including corridor rehabilitation, dual carriageway, 99 bridges and connecting works.

Technical profile

Length
193.24 km
Client
CSS Constructores
Period
November 2014–March 2015
JORGE FANDIÑO S.A.S.Studies approved by the independent supervisor and ANI
03

CALDAS · RISARALDA · ANTIOQUIA

Pacífico 3 Connection

Complementary Phase II studies for new and existing corridors, including 66 bridges and four tunnels.

Technical profile

Length
144 km
Client
Colpatria - Sacyr
Participation
40% · PROIFAN Consortium
Period
December 2013–April 2014
JORGE FANDIÑO S.A.S.Certified experience
04

ANTIOQUIA · SANTANDER

Río Magdalena 2 Highway

Complementary Phase II studies for the Remedios–Puerto Berrío corridor and its connection to Ruta del Sol, including 93 bridges and two tunnels.

Technical profile

Length
144 km
Client
Colpatria - Sacyr
Participation
40% · PROIFAN Consortium
Period
December 2013–April 2014
JORGE FANDIÑO S.A.S.Certified experience
05

VALLE DEL CAUCA

Vía al Puerto

Feasibility study for the Buga–Loboguerrero–Buenaventura corridor covering construction, upgrades, rehabilitation, operation and maintenance.

Technical profile

Length
111.3 km
Scope
19 bridges · 2 tunnels
Client
Vía Pacífico S.A.S.
JORGE FANDIÑO S.A.S.Studies approved by the National Infrastructure Agency
06

CUNDINAMARCA

Subachoque–Tabio–Zipaquirá

Contract for Phase II feasibility studies and design of the road corridor: geometry, hydrology, geotechnics, pavements, bridges, and environmental, social and land components.

Technical profile

Length
36 km
Client
ALCA Ingeniería S.A.S.
Contract
December 2016
JORGE FANDIÑO S.A.S.Executed contract

Our clients.

Public entities, concession companies and businesses in our corporate portfolio, which brings together references from ACTING and the track record of Jorge Fandiño S.A.S.

CASS Constructores
CASS Constructores
Aerocivil
Aerocivil
Neiva–Girardot Highway
Neiva–Girardot Highway
Consorcio Articulación Urbana
Consorcio Articulación Urbana
ALCA Ingeniería
ALCA Ingeniería
Constructora Conconcreto
Constructora Conconcreto
Diconsultoría Ingenieros
Diconsultoría Ingenieros
C&G Ingeniería y Construcciones
C&G Ingeniería y Construcciones
DIMAR
DIMAR
Gobernación del Vichada
Gobernación del Vichada
ICCU
ICCU
Alternativas Viales
Alternativas Viales
Urban Development Institute — IDU
Urban Development Institute — IDU
A Construir S.A.
A Construir S.A.
Aliadas para el Progreso
Aliadas para el Progreso
Ingevías
Ingevías
INVÍAS
INVÍAS
Concesionaria Vial del Pacífico
Concesionaria Vial del Pacífico
Cano Jiménez Estudios
Cano Jiménez Estudios
Constructora Colpatria
Constructora Colpatria
Nuevo Cauca
Nuevo Cauca
Sonacol S.A.S.
Sonacol S.A.S.
Gobernación del Atlántico
Gobernación del Atlántico
Constructora LHS
Constructora LHS
Tren de Occidente
Tren de Occidente
Sacyr Concesiones
Sacyr Concesiones
Alcaldía Municipal de Chía
Alcaldía Municipal de Chía
Concesionaria Vial Unión del Sur — Rumichaca–Pasto
Concesionaria Vial Unión del Sur — Rumichaca–Pasto
Vía Pacífico
Vía Pacífico
Alcaldía Local Rafael Uribe Uribe
Alcaldía Local Rafael Uribe Uribe
Proindesa
Proindesa
Vías del Valle
Vías del Valle
Alcaldía de Yopal
Alcaldía de Yopal
Sincelejo
Sincelejo
Secretaría Distrital del Hábitat
Secretaría Distrital del Hábitat

Let's discuss your
next project.

Tell us about your project's technical challenges and the support you need.

View and download portfolio

2026 company portfolio · PDF in English

EMAILlicitaciones@actinginfraestructura.com
PHONE+57 316 469 7664
FIND US

Calle 123 # 7-51, Office 305
Kaiwa Building · Bogotá, Colombia

TELL US ABOUT YOUR PROJECT

Request a proposal

Briefly tell us what you need so we can prepare the right technical support.

I prefer to use WhatsApp

Your email application will open with the completed information.