AIRPORTS · BOGOTÁ

El Dorado International Airport

Detailed engineering for airport infrastructure.

Client
Aerocivil
Period
2021
Service
Phase III studies and design

CASE STUDY

Engineering applied to an infrastructure challenge.

Phase III design for the extension of runway 13L/31R and its rapid-exit taxiways. The work integrated geometry, geotechnics, pavements, structures and electrical systems.

Technical scope

  • Extension of runway 13L/31R
  • Design of rapid-exit taxiways
  • Geometry, geotechnics and pavements
  • Structures and electrical systems

Origin of the experience

Supported experience.

JORGE FANDIÑO S.A.S.Certified experience · Corporate track record