← All projects
ROADS · NARIÑO
Rumichaca–Pasto
Dual-carriageway design between Rumichaca and El Pedregal.
- Client
- Consorcio SH (Sacyr–Herdoiza)
- Period
- 2016–2017
- Scope
- 44 km · Functional units 1, 2 and 3
CASE STUDY
Engineering applied to an infrastructure challenge.
Phase III design for 44 km across functional units 1, 2 and 3 of the Rumichaca–Pasto road corridor.
Technical scope
- Geometric design and geotechnics
- Drainage and pavements
- Structures and bridges
- Road signage and complementary works
Project gallery
Rumichaca–Pasto
Select an image to view it at a larger size.
Origin of the experience
Supported experience.
JORGE FANDIÑO S.A.S.Certified experience · Corporate track record