RAIL INFRASTRUCTURE
Bogotá–Belencito rail corridor
Phase III studies and design for 72 critical points.
- Client
- Consorcio Dracol Vías Férreas
- Period
- 2013–2014 · 12 months
- Scope
- 72 critical points · Phase III
CASE STUDY
Engineering applied to an infrastructure challenge.
Detailed studies and final design for the construction of 72 critical points on the Bogotá–Belencito, La Caro–Zipaquirá and Bogotá–Facatativá corridors.
Technical scope
- Topography and geology
- Hydrology and hydraulics
- Geotechnics and structures
- Drawings, quantities and cost estimate