Works on the Bogotá–Belencito rail corridor
← All projects

RAIL INFRASTRUCTURE

Bogotá–Belencito rail corridor

Phase III studies and design for 72 critical points.

Client
Consorcio Dracol Vías Férreas
Period
2013–2014 · 12 months
Scope
72 critical points · Phase III

CASE STUDY

Engineering applied to an infrastructure challenge.

Detailed studies and final design for the construction of 72 critical points on the Bogotá–Belencito, La Caro–Zipaquirá and Bogotá–Facatativá corridors.

Technical scope

  • Topography and geology
  • Hydrology and hydraulics
  • Geotechnics and structures
  • Drawings, quantities and cost estimate

Origin of the experience

Supported experience.

JORGE FANDIÑO S.A.S.Certified experience